Bathroom before and after the works (video)
A short video of one bathroom: the state before the works, removal of the old finishes and the finished result with a concealed cistern and wall-hung toilet.
Our work
Photos and video from real jobs: water and drain pipework, concealed cisterns, bathroom fixtures and shower enclosures.
A short video of one bathroom: the state before the works, removal of the old finishes and the finished result with a concealed cistern and wall-hung toilet.

Installed wall-hung toilet, vanity washbasin and a shower with a glass screen.




Photos from work on a washroom: concealed cisterns, installed urinals and wall-hung toilets.





New PPR water pipework and concealed cisterns in a metal stud frame, before the walls are boarded.





Concealed cistern, shower connections and pipework chased into a brick wall, before tiling.



PPR water pipes and floor drains at the rough-in stage.





Photos from several different bathrooms: shower enclosures, wall-hung toilets and washbasins.



Photos from two bathrooms: a concealed cistern and new pipework installed after the old finishes were removed.


Drain pipes set through the rebar before the concrete pour.

PPR pipework with valves and a pump next to a water tank.
Contact
Call, send a message or a photo of the problem. We agree the price before any work starts.
+382 69 465 189Viber didn’t open?
If Viber isn’t installed on this device, message us on WhatsApp or call +382 69 465 189.