Our work

Completed Aqua Prime jobs

Photos and video from real jobs: water and drain pipework, concealed cisterns, bathroom fixtures and shower enclosures.

Bathroom renovation plumbing

Bathroom before and after the works (video)

A short video of one bathroom: the state before the works, removal of the old finishes and the finished result with a concealed cistern and wall-hung toilet.

Vanity unit with washbasin, large mirror and wall-hung toilet in a finished bathroom

Fixtures and shower enclosures

Bathroom with a floor-level shower

Installed wall-hung toilet, vanity washbasin and a shower with a glass screen.

  • Bathroom with a floor-level shower, glass screen and a wall-mounted water heater
  • Shower with a glass screen and a wall-hung toilet
  • Finished bathroom with a vanity washbasin, mirror, wall-hung toilet and a wall-mounted water heater
Row of installed urinals below narrow windows

Fixtures and shower enclosures

Washroom with urinals

Photos from work on a washroom: concealed cisterns, installed urinals and wall-hung toilets.

  • Four concealed cistern frames installed in a row during rough-in
  • Room with three urinals and tiled walls and floor
  • Two wall-hung toilets in a tiled washroom
  • Urinals mounted on a wall with dark tiles
Concealed cistern and PPR pipes before the wall is closed

Bathroom renovation plumbing

Plumbing inside stud walls

New PPR water pipework and concealed cisterns in a metal stud frame, before the walls are boarded.

  • Concealed cistern and water pipes in a metal stud frame
  • Water pipes routed through an insulated metal stud wall
  • Shower connections and PPR pipes in a stud wall
  • Shower mixer connections on a metal stud frame
Brick-walled bathroom with a concealed cistern frame and chased-in pipes

Bathroom renovation plumbing

Bathroom pipework in a brick wall

Concealed cistern, shower connections and pipework chased into a brick wall, before tiling.

  • Concealed cistern and water connections in the corner of a brick bathroom
  • Shower connections and pipework chased into a brick wall
Two PPR water pipes along brick walls

New pipework and pipe replacement

New water lines along the walls

PPR water pipes and floor drains at the rough-in stage.

  • PPR pipes and a floor drain in a room at the rough-in stage
  • Drains and water pipes on the floor before screeding
  • Vertical pipework on a brick wall
  • PPR pipes routed around a brick wall
Shower enclosure, wall-hung toilet and vanity washbasin

Fixtures and shower enclosures

Installed shower enclosures and fixtures

Photos from several different bathrooms: shower enclosures, wall-hung toilets and washbasins.

  • Washbasin on a metal stand, shower enclosure and wall-hung toilet
  • Washbasin, toilet and small water heater in a finished bathroom
Stripped old bathroom with a new concealed cistern and pipework

Bathroom renovation plumbing

Replacing plumbing in old bathrooms

Photos from two bathrooms: a concealed cistern and new pipework installed after the old finishes were removed.

  • Concealed cistern installed in a bathroom after the old tiles were removed
Drain pipes set through foundation rebar before the concrete pour

New pipework and pipe replacement

Drain pipes in a foundation

Drain pipes set through the rebar before the concrete pour.

Pump with valves and PPR pipework next to a water tank

New pipework and pipe replacement

Pump and water tank connections

PPR pipework with valves and a pump next to a water tank.

Contact

Tell us what needs fixing.

Call, send a message or a photo of the problem. We agree the price before any work starts.

+382 69 465 189